Renovation Plans
FAQ (Coming Soon)
WHAT'S NEW?
(last update 8-3-08)
The new auto shop is complete. Demolition has begun on the old auto shop in preparation of the construction of the new northwest entryway and student commons.

Thanks again to the community for supporting educational excellence by approving the building bond referendum in March 2006.

Overall, the plans have been scheduled to create minimal disruption to the learning process, to ensure student and staff safety, and to carefully manage construction costs. Dates are estimated.

Timeline


return to top  

Work in Progress
RBTV'S "TAKE THE TOUR" VIDEOS
McHugh Construction Manager Andy Totten takes you behind the scenes of RB renovation Phase One.
  • Phase 3, Episode 1 (Coming Soon!)
LIVE CONSTRUCTION WEB CAMS
Watch construction progress through two active web cams!
Web Cam 1
Web Cam 2
All web cams are courtesy of RBTV.
.
FIRST FLOOR VIRTUAL TOUR

return to top
 
SECOND FLOOR VIRTUAL TOUR
 
return to top

Drawings and Plans
Exterior Architecture and Proposed Look of New Construction
Exterior Construction vs. Proposed Work
Phase 3A
First Floor
Phase 3A
Second Floor
Phase 3B
First Floor
Phase 3B
Second Floor
Phase 3
All First Floor
Phase 3C
First Floor
Phase 3C
Second Floor
Phase 3
All Second Floor
Phase 3D
First Floor
Phase 3D
Second Floor
return to top

Green Building Plans
Riverside Brookfield High School has gone to great lengths to conduct its renovation in an ecologically responsible manner. Our "green" building practices include:
  • Building materials with recycled content
  • Locally made materials which reduce environmental impact
  • Low VOC emissions materials
  • Refurbishing and reusing existing furniture and fixtures where possible
  • Recycling approximately 80% of demolition waste
  • Exceeding standards for healthy air ventilation
  • On-the-spot room temperature controls
  • Renewed, more efficient heating system
  • Efficient air conditioning with no ozone-depleting refrigerants
  • Centralized digital control fo climate systems
  • Light colored roofs to reduce cooling load
  • Smart plumbing fixtures to lower water use

Want to know more? Read our complete "green renovation" details or visit our Green Goals pages.

return to top

Contacts
PAT SUMROW
Owners Representative
 
E-Mail
psumrow@aol.com

Phone
(630) 408-0640
ANDY TOTTEN
Construction Manager
McHugh Construction
E-Mail
atotten@mchughconstruction.com

Phone
(312) 446-2377
return to top