Welcome to Riverside Brookfield High School's renovation web site. The students, staff, and administration are so thankful to the community which supported the building referendum that made this renovation possible.

Please explore the site to find timelines, photos of the on-going work, live web cams, information on how we're making this a green renovation, current press releases, contact information, and more.
WHAT'S NEW
  • Newly renovated swimming pool opened in November of 2008 (photos available).
  • RBTV opened its new studios in October of 2008 (photos available).
  • New classrooms open in the northwest corner.
  • Work is ongoing in the northwest corner (webcam available).
  • Summer construction has begun.

PRESS RELEASES

RENOVATION IN THE NEWS
Timeline


CONSTRUCTION SLIDESHOWS
Form Object
 
DRAWINGS AND PLANS
Exterior Architecture and Proposed Look of New Construction
Exterior Construction vs. Proposed Work
Phase 3A
First Floor
Phase 3A
Second Floor
Phase 3B
First Floor
Phase 3B
Second Floor
Phase 3
All First Floor
Phase 3C
First Floor
Phase 3C
Second Floor
Phase 3
All Second Floor
Phase 3D
First Floor
Phase 3D
Second Floor
THIS OLD HIGH SCHOOL
Take video tours of the renovation with Construction Manager Andy Totten. Videos courtesy of Gary Prokes and RBTV.

Phase 1, Episode 1
Phase 1, Episode 2

Phase 2, Episode 1
Phase 2, Episode 2
Phase 2, Episode 3
Phase 2, Episode 4
Phase 2, Episode 5

Phase 3, Episode 1
Phase 3, Episode 2

Groundbreaking Ceremony

LIVE WEBCAMS
See ongoing footage of the renovation as it happens.
Web Cam 1
Phase III construction

 
Camera footage courtesy of Gary Prokes and RBTV.
 
Riverside Brookfield High School has gone to great lengths to conduct its renovation in an ecologically responsible manner. Our "green" building practices include:
VISIT OUR "GREEN GOALS" PAGE
Select a link to learn more about our green facilities plan:
  1. Use of materials with recycled content
  2. Use of locally made materials
  3. Use of low VOC emissions materials
  4. Refurbishing of furniture and fixtures
  5. Recycling demolition and construction waste
  6. Ventilation to exceed ASHRAE 62-2004 standard
  7. On-the-spot control of room environment
  8. Renewed, more efficient heating system
  9. Efficient air conditioning with no ozone-depleting refrigerants
  10. Centralized digital control for climate systems
  11. Light colored roofs reduce cooling load
  12. Smart plumbing fixtures for low water use
Use of materials with recycled content

Many of the materials that will be used in the R-B renovation will include recycled content, including ceiling panels, carpeting, ceramic tiles and flooring.

return to top

Use of locally made materials

Using materials made locally reduces energy use and environmental impacts from transportation.  Our project makes extensive use of cast stone and concrete masonry units (cement blocks) made in the Chicago area.

return to top

Use of low VOC emissions materials

Volatile organic compounds (VOCs) are carbon-based substances that can be chemically active in the environment when released.  The RBHS renovation project is using sealants, paints, adhesives and other building materials that are formulated to have low or no emissions of VOCs.

return to top
Refurbishing of furniture and fixtures

Wherever possible, classroom cabinets, whiteboards, corkboards, doors and woodwork were refinished and reused during Phase I, resulting in less discarded demolition waste and less money spent on new materials.

return to top
Recycling of demolition and construction waste

Approximately 80 percent of the materials removed from the school during demolition are being recycled for new uses.  Recycling building materials saves energy that would be spent manufacturing new materials.

return to top
Ventilation to exceed ASHRAE 62-2004 standard

The American Society of Heating, Refrigerating and Air Conditioning Engineers (ASHRAE) standard 62-2004 recommends minimum ventilation and outdoor air exchange rates for maintaining healthy indoor air quality for building occupants.  R-B’s new ventilating system is designed to exceed the ASHRAE standard.

return to top
On-the-spot control of room environment

Each classroom will be equipped with its own thermostat, multiple light switches, blinds and operable windows so that room occupants will be able to set temperatures and lighting to the levels that are right for the task at hand.

return to top
Renewed, more efficient heating system

The school’s heating system is being completely replaced.  The system will still be hydronic (pumped hot water, as opposed to steam), but the boilers will be new with modern controls and efficient natural gas burner technology.

return to top
Efficient air conditioning with no ozone-depleting refrigerants
Finished classrooms will have a complete overhaul. They will feature new floors, ceilings, lighting, and paint. They will be tied in to the new school mechanical system, including air conditioning and heating. Many will have state of the art ceiling mounted audio-visual projection systems as well. Take a look at renovated classrooms by viewing a video tour.

return to top
Centralized, digital control of climate systems

The ventilation and air conditioning system will have all-new direct digital controls, which along with the heating system controls will be programmed and monitored from a central computer in the Buildings and Grounds offices.  This centralized control will allow the facilities crew to locate and repair problems quickly to keep the system running at top efficiency.

return to top
Light colored roof reduces cooling load

Where new roofing is being installed, light-colored roof coverings are being used to reduce heating of the roof.  This will reduce the need for cooling in the building below and save energy.  It will also reduce the building’s contribution to the “urban heat island” effect, where man-made surfaces like pavements and roofs absorb solar heat and drive up local air temperatures.

return to top

Smart plumbing fixtures reduce water use

Motion sensor valves and timed on-off operation will be used on bathroom sink faucets and toilets to reduce water consumption.  Lower water consumption reduces community water treatment plant throughput, which means lower energy consumption.

return to top

OWNERS' REPRESENTATIVE
Pat Sumrow

e-mail: psumrow@aol.com
phone: (630) 408-0640
 
CONSTRUCTION MANAGER
Andy Totten

e-mail: atotten@mchughconstruction.com
phone: (312) 446-2377
 
COMPANIES
James McHugh Construction Company
Wight @ Company